
About the Research
- Project Title Papagayo
- Location Guanacaste, Costa Rica
Project Summery
Guanacaste, Costa Rica
Municipality Water Well
100m in depth
Water well drilled in 24” diameter and fully cased using Roscoe Moss 16” HSLA Well Casing.
Water Well produces in 100 liters per second.